2025 : Mat-Su Central School (Wasilla, Alaska)
Two Story Building with approximately 1000 linear ft of new paved road and path ways. Additional work to include trunk road connector with lighting (Alaska DOT Standards)
Two Story Building with approximately 1000 linear ft of new paved road and path ways. Additional work to include trunk road connector with lighting (Alaska DOT Standards)
Supply and Install all cabling for the Direct Digital Control system for Bethel School.
Owner: Prince William Sound Science Center General Contractor: Dawson Construction Square Footage: Completion: December 2023
Construction of a modern 10,650 SF Christian Education Center with enclosed areas for K-12 classrooms with food service, recreational and meeting spaces.
Install DDC System in new addition & replace existing system in current school as part of the renovation.
Owner: Lower Kuskokwim School District General Contractor: ATS Alaska Square Footage: Completion: October 2021
3 story dental training center for ANTHC including six dental chairs, sterilization units, labs, exam rooms, training classrooms, and office space.
Owner: University of Alaska Anchorage General Contractor: Blomfield Construction Square Footage: Completion: September 2018
Owner: Mat-Su Burough School District General Contractor: n/a Square Footage: Completion: September 2017
CM/GC Design Assist JR/SR Highschool with Vo tech style welding / wood / engine shops, auditorium, gyms, classrooms, laboratories, and illuminated football field. Project also included a fire water tower with pump controls. Equipment included a 1 Meg generator, fire alarm, security, Stage A/V system, lighting controls, PA, smartboards, and other specialty systems.
Owner: General Contractor: ATS Alaska Square Footage: Completion: August 2016
Owner: Mat-Su Borough School District General Contractor: ATS Alaska Square Footage: Completion: August 2016
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2016
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2016
Owner: Anchorage School District General Contractor: F&W Construction Co., Inc. Square Footage: Completion: August 2015
Owner: Lower Yukon School District General Contractor: Dokoozain Construction LLC Square Footage: Completion: July 2015
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2015
Owner: Lower Yukon School District General Contractor: Dokoozain Construction LLC Square Footage: Completion: March 2015
Owner: City of Valdez General Contractor: Dawson Construction Square Footage: Completion: November 2014
Owner: Lower Yukon School District General Contractor: Dowland Construction, Inc. Square Footage: 53,000 Completion: October 2014
Owner: Lower Yukon School District Square Footage: Completion: August 2014
Installation of lighting upgrades to the main auditorium and lobby areas.
Owner: Lower Yukon School District General Contractor: Neeser Construction, Inc. Square Footage: 32,577 Completion: December 2011
Installation of conduit, wire boxes and control devices for a new heating and ventilation controls system.
Owner: University of Alaska, Anchorage General Contractor: SR Bales Construction Completion: December 2009
This project consists of a two-story 32,577 square foot K-12 School Building. It has the latest state of the art clock/IC/PA, security, fire alarm, MATV, telephone/data cabling systems, standby generator, kitchen, shop, cafeteria and gymnasium areas.
This project consisted of a two-story 40,000 square foot K-12 School Building. It has the latest state of the art clock/IC/PA, security access, fire alarm, MATV, telephone/data cabling systems, kitchen, shop, gymnasium and cafeteria Areas.
This project consisted of a two-story 75,000 square foot K-12 School Building. It has the latest state of the art CCTV, clock/IC/PA, security access, fire alarm, MATV and telephone/data Systems. It has a full kitchen with walk-in cooler and freezers, a complete up to date shop area, full gymnasium, cafeteria area, back-up standby generator system and a lift station.