2024 : NVE Dental Remodel (Cordova, Alaska)

The general scope of services is to provide all materials, equipment, and labor to renovate approximately 1,400 sq-ft of existing space to convert for use in dental services as well as the added renovation of 420 sq-ft Lab on the second floor.

By meadmin, ago

2021 : Valdez Fire Station 1 (Valdez, Alaska)

Fire station with ten door apparatus bay, six dorm rooms, gym, training rooms, offices and training tower. Systems included APS fire alerting system, Access control, CCTV, PA, Fire Alarm, Back up power, Data, and automated door/street sign system.

By meadmin, ago

2020 : Yakutat Community Health Center (Yakutat, Alaska)

Construct New Health Center, to include wellness center, Paramedic Area, Dental, onsite lab and backup power provided with a 150Kw Generator. This project is only accessible via monthly barges in the winter months and has ferry access through the winter so extreme care must be taken with materials, coordination and transit.

By meadmin, ago

2018 : The Children’s Place (Wasilla, Alaska)

The Children’s Place project integrated mental health staff with OCS, Alaska State troopers, medical staff under one roof to assist children in crisis. Project consisted of security, backup power, separate data systems for different agencies, and court admissible recording systems.

By meadmin, ago

2017 : Joe Redington High School (Wasilla, Alaska)

CM/GC Design Assist JR/SR Highschool with Vo tech style welding / wood / engine shops, auditorium, gyms, classrooms, laboratories, and illuminated football field. Project also included a fire water tower with pump controls. Equipment included a 1 Meg generator, fire alarm, security, Stage A/V system, lighting controls, PA, smartboards, and other specialty systems.

By admin, ago

2016 : Trailer Craft of Anchorage (Anchorage, Alaska)

This project consisted of a two-story 34,500 square-foot office, store front, warehouse, Class I Div II (16) truck bays with overhead doors, (1) wash bays, fueling stations and tanks. Coordination was done with the Local Utility to extend new power to a 600A, 480V, three-phase main electrical service, all feeders and conductors were provided as copper.

By meadmin, ago

2013 : FTR269B Brigade Complex (JBER, Alaska)

The Brigade Complex project is a design-build with a out-of-state contractor, Korte/Purcell JV. We are part of the design team and are working closely with both the engineers and the construction team. This is a LEEDs project that has all the expected disciplines including; service and distribution, telcom data, fire alarm, CCTV, outside Plant, testing and quality control.

By admin, ago

2012 : Nullagvik Hotel (Kotzebue, Alaska)

New design/build 4-story wood frame construction with 75 hotel rooms. Installed complete electrical work including fire alarm system, tel/data raceway system, TV distribution system, 2000 amp building service with aluminum feeder cables, full blown kitchen area and meeting rooms with AV rough-in.

By admin, ago

2012 : Warriors-in-Transition Complex (Ft. Richardson, Alaska)

New design/build 80-man ADA compliant barracks, battalion headquarters, company head quarters building and a solder family assistance center building. 6,713 SF Soldier Family Assistance Center, 48,989 SF ADA compliant 80PN Barracks, 8,030 SF Battalion Head Quarters, 9,020 SF Company Head Quarters, over 1 mile of fiber optic and copper plant extension, SIRPNET with holocom raceways. Installation of complete fire alarm, mass notification, area of refuge communications, data systems and SIPRNET VIA holocom raceways.

By admin, ago

2010 : Design/Build 7 and 8 Bay F22 Shelters (Elmendorf AFB, Alaska)

This project consists of two F22 Shelters, one 7-Bay at 47,832 square feet with 14 Mega Doors and one 8-Bay at 54,344 square feet with 16 Mega Doors. We furnished complete Electrical Engineering and supplied Performance and Payment Bonds. Both shelters have full Fire Alarm Systems with Monaco transmitter and antenna to communicate to the Base Monaco receiver and complete Fire Suppression Systems.

By admin, ago

2009 : Blueberry Area Water & Street Improvement (Palmer, Alaska)

This project consists of furnishing and installing 35 street light poles. They have state of the art LED fixtures from BETA Company. The poles are located throughout 6 city streets in Palmer AK. Two 100 amp, fully enclosed load centers are included to power the new lighting. HDPE and Rigid conduit was used with #8 and #6 illumination cables for the wiring.

By admin, ago

2009 : Hangars #10 and #11-EAFB (Elmendorf Air Force Base, Alaska)

This project consists of remodeling two existing Hangers and wiring for a new foam fire suppression systems pump room building.  Includes re-wiring the existing high voltage primary system, installing new transformers and building services, and complete removal of the existing light fixtures and installing new HID lighting.

By admin, ago

2008 : Sockeye Inn (Anchorage, Alaska)

This project consists of a new 3-story, 18,812 square foot Boarding House/Hotel. It has a complete fire alarm, telephone/data, CCTV and door entry control systems installed. This is a first class extended stay type facility that has an appearance of salmon scales on the outside skin, quite unique for Alaska.

By admin, ago

2007 : Anchorage Rental Car Center (Anchorage, Alaska)

This project consisted of a three story 581,000 square foot parking garage with a rental car lobby, twelve car washes, vacuum systems, fueling stations, canopy and tanks.  It has a CCTV camera security system, duress phone system and complete fire alarm system. 

By admin, ago

2007 : Aleutian Pribilof Island Association (APIA) Office Building (Anchorage, Alaska)

This project consisted of a 3-story, 39,000 square foot Class ‘A’ office building. This project included an integrated CCTV, card access, security and fire alarm systems. It has a full executive board room with a design build AV System and IFS panels were used to reduce the foot print of the switch gear and the electrical rooms allowing the customer more space for actual offices.

By admin, ago

2007 : Hooper Bay K-12 School (Hooper Bay, Alaska)

This project consisted of a two-story 75,000 square foot K-12 School Building.  It has the latest state of the art CCTV, clock/IC/PA, security access, fire alarm, MATV and telephone/data Systems.  It has a full kitchen with walk-in cooler and freezers, a complete up to date shop area, full gymnasium, cafeteria area, back-up standby generator system and a lift station.

By admin, ago

2007 : FAA Tower Fire Alarm Upgrades (Anchorage, Alaska)

This project consisted of a complete fire alarm upgrade with the facility under full use and was performed under conditions that had zero tolerance for shutdowns or mistakes.   Megawatt’s field foreman and project manager worked very closely with FAA representatives and the fire alarm contractor to insure that the primary goals of safety and reliability were met.

By admin, ago

2006 : Alutiiq Center (Anchorage, Alaska)

This project consisted of a five-story 81,000 square foot class “A” office building with a 64,000 square foot two story parking garage adjacent to the office building.  It has a Full Card Access System, CCTV, MATV, Fire Alarm and Telephone/Data systems along with two state of the art Board Rooms and back-up Generator System for the Elevators.

By admin, ago