2024 : NVE Dental Remodel (Cordova, Alaska)

The general scope of services is to provide all materials, equipment, and labor to renovate approximately 1,400 sq-ft of existing space to convert for use in dental services as well as the added renovation of 420 sq-ft Lab on the second floor.

By meadmin, ago

2021 : Valdez Fire Station 1 (Valdez, Alaska)

Fire station with ten door apparatus bay, six dorm rooms, gym, training rooms, offices and training tower. Systems included APS fire alerting system, Access control, CCTV, PA, Fire Alarm, Back up power, Data, and automated door/street sign system.

By meadmin, ago

2020 : Yakutat Community Health Center (Yakutat, Alaska)

Construct New Health Center, to include wellness center, Paramedic Area, Dental, onsite lab and backup power provided with a 150Kw Generator. This project is only accessible via monthly barges in the winter months and has ferry access through the winter so extreme care must be taken with materials, coordination and transit.

By meadmin, ago

2018 : The Children’s Place (Wasilla, Alaska)

The Children’s Place project integrated mental health staff with OCS, Alaska State troopers, medical staff under one roof to assist children in crisis. Project consisted of security, backup power, separate data systems for different agencies, and court admissible recording systems.

By meadmin, ago

2016 : Trailer Craft of Anchorage (Anchorage, Alaska)

This project consisted of a two-story 34,500 square-foot office, store front, warehouse, Class I Div II (16) truck bays with overhead doors, (1) wash bays, fueling stations and tanks. Coordination was done with the Local Utility to extend new power to a 600A, 480V, three-phase main electrical service, all feeders and conductors were provided as copper.

By meadmin, ago

Fall 2025 : Install PEB and Wash Rack (JBER, Alaska)

This project is to construct a new heated pre‐engineered building (PEB) Wash Rack facility. Work consists of design and construction of a new concrete foundation, design and assembly of an insulated PEB, fastening the PEB to the concrete slab, installation of wash rack and all associated water, water heater, water storage, pumps/motors washing devices …

By meadmin, ago

Fall 2025 : Replace UST with AST MSU (Valdez, Alaska)

Marine Safety Office: Demolition and removal of underground fuel storage tank and replacing it with a new 3,000 gallon above ground storage tank at the Marine Safety Office. Includes a new canopy with Class 1 Div II lighting and electronic tank monitoring.
Cutter Support Building: Demolition and removal of an underground storage tank that supplied fuel to the building heating system. installation of a new 480v service on the building to support a new electric boiler to heat the building.

By meadmin, ago

Spring 2025 – Heavy Equipment Shop

Owner: Qayak Construction General Contractor: H. WATT & SCOTT Square Footage: 13,806 Completion: Spring 2025 Heavy Equipment Shop with Building includes, vehicle maintenance bays, heavy equipment bays, full mezzanine with parts storage and multiple office spaces.