2021 : USCG C130J Phase 2 Transitional Facilities Upgrades (USCG Air Station Kodiak, Alaska)
This project involves remodeling of 5 areas within Hangar 1 (Building 14) to accommodate the functions associated with the new C130J aircraft.
This project involves remodeling of 5 areas within Hangar 1 (Building 14) to accommodate the functions associated with the new C130J aircraft.
This project is to recommission, reconfigure, and renovate the existing, but unoccupied, former senior center (approximately 7,690sf) in Bethel, Alaska into a safe and code compliant homeless shelter.
CM/GC Design Assist JR/SR Highschool with Vo tech style welding / wood / engine shops, auditorium, gyms, classrooms, laboratories, and illuminated football field. Project also included a fire water tower with pump controls. Equipment included a 1 Meg generator, fire alarm, security, Stage A/V system, lighting controls, PA, smartboards, and other specialty systems.
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2016
Owner: City of Nome General Contractor: ASRC SKW Square Footage: Completion: June 2016
We are providing the complete wiring for an enclosed water park. It will include pool pumps, wave pool, lazy river, water slide, wading area, and chemical machines. There are many pieces of exercise equipment, a free weight area, and a full size gymnasium. The special systems include a fire alarm system, public address system, and phone/data.
Owner: Orthopedic Physicians Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2015
This is a remodel of existing fire station 4 on Elmendorf AFB. There are two additions, front, and back. We are installing new lighting, phone/data, fire alarm, and power.
Owner: Lower Yukon School District General Contractor: Dokoozain Construction LLC Square Footage: Completion: July 2015
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2015
Owner: Body Renew General Contractor: PCG General Contracting, LLC Square Footage: Completion: April 2015
Owner: Lower Yukon School District General Contractor: Dokoozain Construction LLC Square Footage: Completion: March 2015
Owner: City of Valdez General Contractor: Dawson Construction Square Footage: Completion: November 2014
Owner: Lower Yukon School District General Contractor: Dowland Construction, Inc. Square Footage: 53,000 Completion: October 2014
Owner: PMAC General Contractor: MCN Construction, Inc. Square Footage: Completion: October 2014
Owner: Lower Yukon School District Square Footage: Completion: August 2014
Complete Media Center with TV Studio, control rooms, 69 rack server room, UPS, backup generator, conference rooms, and offices.
Owner: Litiha Dodge General Contractor: MCN Construction, Inc. Square Footage: Completion: July 2014
Owner: Alaska Native Medical Center General Contractor: Neeser Construction, Inc. Square Footage: Completion: June 2014
Owner: Barrow Street LLC General Contractor: Neeser Construction, Inc. Square Footage: 44,988 Completion: March 2014
This project is a design/assist project to renovate existing office and warehouse space into a television studio. The design will require MWE to furnish and install a new 350kVA generator, 800A transfer switch, transformers, panel boards, branch circuitry, lighting, card access, and a pre-action fire alarm system.
Owner: Continental Auto Group General Contractor: MCN Construction, Inc. Completion: September 2013
Copper River Native Association- Robert Marshall Building – Community Health & Wellness Center
Tazlina new design/build health clinic with 8 dental chairs, mental health, primary care, x-ray, and other clinic functions.
The Brigade Complex project is a design-build with a out-of-state contractor, Korte/Purcell JV. We are part of the design team and are working closely with both the engineers and the construction team. This is a LEEDs project that has all the expected disciplines including; service and distribution, telcom data, fire alarm, CCTV, outside Plant, testing and quality control.
Owner: Alaska Air National Guard General Contractor: Iyabak Construction LLC Square Footage: Completion: March 2013
Owner: General Communications, Inc. General Contractor: Lake View General Contracting Square Footage: 8,500 Completion: December 2012
Emergency Generator Upgrade
Construction of a new Court Yard
Owner: Walgreens General Contractor: MCN Construction, Inc. Square Footage: Completion: October 2012
Various energy efficiency improvements.
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2012
New design/assist 84,200 SF state of the art crime detection laboratory building in Anchorage, Alaska. Worked hand-in-hand with the owner and their team. Complete electrical including eight security access controls, CCTV, duress systems and 750 KVA emergency standby and UPS system.
Restaurant in Terminal C of the Airport
New design/build 4-story wood frame construction with 75 hotel rooms. Installed complete electrical work including fire alarm system, tel/data raceway system, TV distribution system, 2000 amp building service with aluminum feeder cables, full blown kitchen area and meeting rooms with AV rough-in.
New design/build 80-man ADA compliant barracks, battalion headquarters, company head quarters building and a solder family assistance center building. 6,713 SF Soldier Family Assistance Center, 48,989 SF ADA compliant 80PN Barracks, 8,030 SF Battalion Head Quarters, 9,020 SF Company Head Quarters, over 1 mile of fiber optic and copper plant extension, SIRPNET with holocom raceways. Installation of complete fire alarm, mass notification, area of refuge communications, data systems and SIPRNET VIA holocom raceways.
Installation of lighting upgrades to the main auditorium and lobby areas.
Owner: Lower Yukon School District General Contractor: Neeser Construction, Inc. Square Footage: 32,577 Completion: December 2011
Tenant improvements to 48 unit project to serve chronic homeless alcoholics. Improvements to include the addition of an elevator, mechanical upgrades, new CCTV & intercom systems as well as upgrades to the existing fire alarm system.
Owner: Fisher House Foundation, Inc. General Contractor: Neeser Construction, Inc. Completion: December 2011
Installation of new AV systems to include whiteboards & video conferencing to their new VA Facility in East Anchorage.
Sports Bar theme restaurant in the new Tikahtnu Commons Mall.
Addition of a digital shooting range to an existing building.
Distribution, power & lighting, voice/data networking, fire alarm systems
Various Smaller Projects
New construction of the Salvation Army Community Center
Owner: Bristol Bay Area Health Corporation General Contractor: Dar-Con Corporation, Inc. Completion: March 2011
Furnish and install standby generator sets and automatic power transfer switches at West Lakes PSB’s 81 & 72 and Palmer ambulance PSB 39.
Owner: Browman Development General Contractor: F-E Contracting, Inc. Completion: December 2010
Supply and installation of hate electrical work including service and distribution lights, fire alarm, phone and data, weapons vault security system.
Installation of conduit, wire boxes and control devices for a new heating and ventilation controls system.
This project was a total remodel of the Valley Hospital into the Palmer State Office Building. The unique aspect of this project was that it consisted of keeping the tenants in the building operational with no break in service during the complete re-model.
Complete remodel and upgrades to existing building. New fire alarm system for remodeled portion of the building tied into the existing fire alarm system. Installed new lighting, power and telephone/data systems. Installed new vindicator security system for weapons vault.
This project consists of two F22 Shelters, one 7-Bay at 47,832 square feet with 14 Mega Doors and one 8-Bay at 54,344 square feet with 16 Mega Doors. We furnished complete Electrical Engineering and supplied Performance and Payment Bonds. Both shelters have full Fire Alarm Systems with Monaco transmitter and antenna to communicate to the Base Monaco receiver and complete Fire Suppression Systems.
Complete security card access system.
Provide and install all power, lighting, voice/data and security for a complete operating system for the new Credit Union 1, Mtn View Branch.
Supply and installation of the electrical work including transformer upgrades, lighting, fire alarm, phone and data.
Owner: U.S. Air Force General Contractor: McGee Industries Completion: June 2010
This project consists of a 75,000square foot three-story medical office building with ties to the new three-story parking garage and the existing PCC II office building. It has the latest state of the art security, fire alarm, telephone/data and nurse call systems. It utilizes the latest LED fixtures for the display cases and corridor lighting.
Executive airplane hangars and office space.
Owner: University of Alaska, Anchorage General Contractor: SR Bales Construction Completion: December 2009
This project consists of remodeling a three-storie above ground dormitory and full basement underground with support offices. It has full Fire Alarm, Mass Notification and Telephone/Data Systems. It includes a complete new Service and Primary Distribution Systems with added Site Lighting.
Owner: Coastal Village Seafoods Region General Contractor: Coastal Village Seafoods Region Completion: November 2009
This project consists of furnishing and installing 35 street light poles. They have state of the art LED fixtures from BETA Company. The poles are located throughout 6 city streets in Palmer AK. Two 100 amp, fully enclosed load centers are included to power the new lighting. HDPE and Rigid conduit was used with #8 and #6 illumination cables for the wiring.
This project consists of a new 8,151 square foot block warehouse building for engine parts storage.
Owner: Cook Inlet Housing Authority General Contractor: Neeser Construction, Inc. Square Footage: Completion: October 2009
This project consists of remodeling two existing Hangers and wiring for a new foam fire suppression systems pump room building. Includes re-wiring the existing high voltage primary system, installing new transformers and building services, and complete removal of the existing light fixtures and installing new HID lighting.
This project consists of a two-story 32,577 square foot K-12 School Building. It has the latest state of the art clock/IC/PA, security, fire alarm, MATV, telephone/data cabling systems, standby generator, kitchen, shop, cafeteria and gymnasium areas.
Owner: City of Eagle River General Contractor: Watterson Construction, Inc. Completion: September 2009
This project consists of a two-story office included within a 40,000 square foot warehouse/office type building. It has several Rail Cranes, Welders and other misc. equipment per the Tenant’s layout.
This project consists of a complete remodel of the existing 41,171 square foot railroad Historic Freight Shed into a modern state of the art space for future Offices, Retail Store, Restaurant, Entertainment and Tourism areas.
This project consists of a one-story block Dialysis Clinic building. It has a full building standby backup generation system installed so none of the crucial dialysis equipment would fail in the event of a loss of power.
This project consists of two buildings comprising a 15,000 square foot Processing Plant complete with wiring of all automatic control systems and a 5,200 square foot maintenance building with complete wiring of power, lights, fire alarm, telephone/data cabling, heat trace, disconnects and starters for the processing equipment.
Renovation of existing building into new state of the art Dialysis Center. fire alarm, nurse call, security and tel/data and sub-metering systems with back up power were installed for this project.
This project consists of a three-story 212,260 square foot Class “A” Convention Facility. It has a 50,000 square foot exhibit hall, 25,000 square foot ballrooms and meeting rooms with complete dimming system, huge lobby area and full scale kitchen area with walk-in coolers/freezers.
This project consists of a new 3-story, 18,812 square foot Boarding House/Hotel. It has a complete fire alarm, telephone/data, CCTV and door entry control systems installed. This is a first class extended stay type facility that has an appearance of salmon scales on the outside skin, quite unique for Alaska.
This project consisted of a three story 172,500 square foot parking garage with a sky bridge connecting the Primary Care Center Phase III medical office building on the second floor. It has an elevator capture fire alarm system and lobby cardkey System.
This project consisted of a three-story 62,253 square foot Medical Building with various tenants. It has a card access door system, fire alarm and telephone/data systems.
This project consisted of a three story 581,000 square foot parking garage with a rental car lobby, twelve car washes, vacuum systems, fueling stations, canopy and tanks. It has a CCTV camera security system, duress phone system and complete fire alarm system.
This project consisted of a 3-story, 39,000 square foot Class ‘A’ office building. This project included an integrated CCTV, card access, security and fire alarm systems. It has a full executive board room with a design build AV System and IFS panels were used to reduce the foot print of the switch gear and the electrical rooms allowing the customer more space for actual offices.
This project consisted of a 20,720 square foot McKinnell Housing Unit with full kitchen and cafeteria areas, management offices and a 5,724 square foot Cares for Kids Crisis Center with a complete lighted parking lot area.
This project consisted of a two-story 40,000 square foot K-12 School Building. It has the latest state of the art clock/IC/PA, security access, fire alarm, MATV, telephone/data cabling systems, kitchen, shop, gymnasium and cafeteria Areas.
This project consisted of a two-story 75,000 square foot K-12 School Building. It has the latest state of the art CCTV, clock/IC/PA, security access, fire alarm, MATV and telephone/data Systems. It has a full kitchen with walk-in cooler and freezers, a complete up to date shop area, full gymnasium, cafeteria area, back-up standby generator system and a lift station.
This project consisted of a complete fire alarm upgrade with the facility under full use and was performed under conditions that had zero tolerance for shutdowns or mistakes. Megawatt’s field foreman and project manager worked very closely with FAA representatives and the fire alarm contractor to insure that the primary goals of safety and reliability were met.
This project consisted of a five-story 81,000 square foot class “A” office building with a 64,000 square foot two story parking garage adjacent to the office building. It has a Full Card Access System, CCTV, MATV, Fire Alarm and Telephone/Data systems along with two state of the art Board Rooms and back-up Generator System for the Elevators.
These projects were a few of Megawatt’s very first projects when we were starting up our business in the fall of 2004. Our complete fleet of vehicles included one service van and one pickup truck with two electricians on our payroll.
This is a new 1-story Medical Dialysis Clinic consisting of 20,000 square foot furred out block building. The project broke ground in September 2004 and completely enclosed and heated by February 2005. It was completed and turned over to the owner on May 30, 2005.
Joint Base Elmendorf‐Richardson (JBER) is located on the northern edge of Anchorage, Alaska and is accessible from the Glenn highway at Boniface Parkway. The project location is on the Richardson side of the installation at Building 952. This project shall be accomplished as an Open Market General Construction Design Build (D-B) Project.