2021 : USCG C130J Phase 2 Transitional Facilities Upgrades (USCG Air Station Kodiak, Alaska)
Owner: USCG
General Contractor: Iyabak Construction, LLC
Square Footage: 95404
Completion: May 2021
This project involves remodeling of 5 areas within Hangar 1 (Building 14) to accommodate the functions associated with the new C130J aircraft. The spaces to be renovated under this project include the following: First Floor South – Propeller Shop #1055, First Floor North – Maintenance Control #1150 and QA Office #1120, First Floor North – Passenger (PAX) Terminal #1118 and Sensor Shop #1119, First Floor North – Avionics Shop #1100, Second Floor South – Facilities Engineering (FAC ENG) (E-8 Offices) #2005. This project involves Architecture, Structure, Mechanical, Electrical and Fire Protection engineering.